[FAR Part § 121.419: Pilots and flight engineers: Initial, transition, and upgrade ground training -- FAA FARS, 14 CFR] -- Flightsim Aviation Zone - Number 1 Flight Simulation and Aviation Resource! Information, Tools, Downloads, Databases, FAQ, Aviation Humour, Glossaries, Directory, FS2006, Multimedia, Screenshots, Free Flight Planner, Weather Reports | Aviation Databases - aircraft, airports, airlines, countries, timezones | Flight Simulator X
  Wednesday 9 September 2026 22:27 GMT  

FAA Federal Aviation Regulations (FARS, 14 CFR)

FARs   >   Part 121   >   Section 419 - Pilots and flight engineers: Initial, transition, and upgrade ground training

PREVIOUS section 121.418  |  section 121.420 NEXT

FONT
serif sans
TEXT SIZE
T T T T
(a) Initial, transition, and upgrade ground training for pilots and flight engineers must include instruction in at least the following as applicable to their assigned duties:

(1) General subjects --

(i) The certificate holder's dispatch or flight release procedures;

(ii) Principles and methods for determining weight and balance, and runway limitations for takeoff and landing;

(iii) Enough meteorology to insure a practical knowledge of weather phenomena, including the principles of frontal systems, icing, fog, thunderstorms, and high altitude weather situations;

(iv) Air traffic control systems, procedures, and phraseology;

(v) Navigation and the use of navigation aids, including instrument approach procedures;

(vi) Normal and emergency communication procedures;

(vii) Visual cues prior to and during descent below DH or MDA;

(viii) Approved crew resource management initial training; and

(ix) Other instructions as necessary to ensure his competence.

(2) For each airplane type --

(i) A general description;

(ii) Performance characteristics;

(iii) Engines and propellers;

(iv) Major components;

(v) Major airplane systems (i.e., flight controls, electrical, hydraulic); other systems as appropriate; principles of normal, abnormal, and emergency operations; appropriate procedures and limitations;

(vi) Procedures for --

(A) Recognizing and avoiding severe weather situations;

(B) Escaping from severe weather situations, in case of inadvertent encounters, including low-altitude windshear, and

(C) Operating in or near thunderstorms (including best penetrating altitudes), turbulent air (including clear air turbulence), icing, hail, and other potentially hazardous meteorological conditions;

(vii) Operating limitations;

(viii) Fuel consumption and cruise control;

(ix) Flight planning;

(x) Each normal and emergency procedure; and

(xi) The approved Airplane Flight Manual.

(b) Initial ground training for pilots and flight engineers must consist of at least the following programmed hours of instruction in the required subjects specified in paragraph (a) of this section and in §121.415(a) unless reduced under §121.405:

(1) Group I airplanes --

(i) Reciprocating powered, 64 hours; and

(ii) Turbopropeller powered, 80 hours.

(2) Group II airplanes, 120 hours.

[Doc. No. 9509, 35 FR 90, Jan. 3, 1970, as amended by Amdt. 121-199, 53 FR 37696, Sept. 27, 1988; Amdt. 121-250, 60 FR 65949, Dec. 20, 1995]
PRINTABLE VERSION of this PageE-MAIL THIS PAGE to Somebody!SAVE TO FAVORITES / Bookmark this PageLINK TO THIS PAGE! (view simple HTML code)

Current page:   FARs   >   Part 121   >   Section 419 - Pilots and flight engineers: Initial, transition, and upgrade ground training

PREVIOUS section 121.418  |  section 121.420 NEXT

page stats: viewed 4250 unique times - last change 28-Jan-2005

SEARCH the FARS :

Top of Page

» DOWNLOADING (PARTS OF) THIS WEBSITE AUTOMATICALLY IS NOT ALLOWED! «

THIS IS NO OFFICIAL SOURCE -- [DISCLAIMER] [FAA WEBSITE]

See also: AIM | ATC | FSS | NOTAMS | PCG |

Top of page
add to favorites @ E-mail this! Link to this!
Top of page
© 2002-2026 - Legal | Contact | Advertise | Sitemap
Visit our $pons0rs:
hosted by 123XS || also visit: Flightsim Search & Aviation Search || Link to us!