[FAR Part § 25.1363: Electrical system tests -- FAA FARS, 14 CFR] -- Flightsim Aviation Zone - Number 1 Flight Simulation and Aviation Resource! Information, Tools, Downloads, Databases, FAQ, Aviation Humour, Glossaries, Directory, FS2006, Multimedia, Screenshots, Free Flight Planner, Weather Reports | Aviation Databases - aircraft, airports, airlines, countries, timezones | Flight Simulator X
  Thursday 10 September 2026 20:37 GMT  

FAA Federal Aviation Regulations (FARS, 14 CFR)

FARs   >   Part 25   >   Section 1363 - Electrical system tests

PREVIOUS section 25.1357  |  section 25.1381 NEXT

FONT
serif sans
TEXT SIZE
T T T T
(a) When laboratory tests of the electrical system are conducted --

(1) The tests must be performed on a mock-up using the same generating equipment used in the airplane;

(2) The equipment must simulate the electrical characteristics of the distribution wiring and connected loads to the extent necessary for valid test results; and

(3) Laboratory generator drives must simulate the actual prime movers on the airplane with respect to their reaction to generator loading, including loading due to faults.

(b) For each flight condition that cannot be simulated adequately in the laboratory or by ground tests on the airplane, flight tests must be made.
PRINTABLE VERSION of this PageE-MAIL THIS PAGE to Somebody!SAVE TO FAVORITES / Bookmark this PageLINK TO THIS PAGE! (view simple HTML code)

Current page:   FARs   >   Part 25   >   Section 1363 - Electrical system tests

PREVIOUS section 25.1357  |  section 25.1381 NEXT

page stats: viewed 4452 unique times - last change 08-Jan-2005

SEARCH the FARS :

» DOWNLOADING (PARTS OF) THIS WEBSITE AUTOMATICALLY IS NOT ALLOWED! «

THIS IS NO OFFICIAL SOURCE -- [DISCLAIMER] [FAA WEBSITE]

See also: AIM | ATC | FSS | NOTAMS | PCG |

Top of page
add to favorites @ E-mail this! Link to this!
Top of page
© 2002-2026 - Legal | Contact | Advertise | Sitemap
Visit our $pons0rs:
hosted by 123XS || also visit: Flightsim Search & Aviation Search || Link to us!