(a) When laboratory tests of the electrical system are conducted --
(1) The tests must be performed on a mock-up using the same generating equipment used in the airplane;
(2) The equipment must simulate the electrical characteristics of the distribution wiring and connected loads to the extent necessary for valid test results; and
(3) Laboratory generator drives must simulate the actual prime movers on the airplane with respect to their reaction to generator loading, including loading due to faults.
(b) For each flight condition that cannot be simulated adequately in the laboratory or by ground tests on the airplane, flight tests must be made.
  
Current page: FARs > Part 25 > Section 1363 - Electrical system tests
section 25.1357 |
section 25.1381

page stats: viewed 4452 unique times - last change 08-Jan-2005
» DOWNLOADING (PARTS OF) THIS WEBSITE AUTOMATICALLY IS NOT ALLOWED! «
THIS IS NO OFFICIAL SOURCE --
[DISCLAIMER]
[FAA WEBSITE]
See also:
AIM | ATC | FSS | NOTAMS | PCG | |